<html>
<head>
<style><!--
.hmmessage P
{
margin:0px;
padding:0px
}
body.hmmessage
{
font-size: 12pt;
font-family:Calibri
}
--></style></head>
<body class='hmmessage'><div dir='ltr'>&nbsp;<BR>&nbsp;<BR>Second Ave. work started at Tenth St. bridge and had been completed to about Bates Street by PAT takeover.&nbsp; There was still about a mile - or less to go&nbsp;to Greenfield Ave.<BR>&nbsp;<BR>Fifth Ave. work was&nbsp;in vicinity of Third Presbyterian Church.&nbsp;&nbsp;The 'Mohawk' fantrip&nbsp;(1664???) included photo stops on the&nbsp;single track.&nbsp; That was an&nbsp;era when rail service was continued during major track renewal work.<BR>&nbsp;<BR>For a great $12 lunch, you and your high school classmates should try the La Brasserie Parisienne &nbsp;across Place St. James from the Cathedral in Compiegne.<BR>&nbsp;<BR><br>&nbsp;<BR><div>&gt; From: fwschneider@comcast.net<br>&gt; Date: Mon, 12 May 2014 21:00:53 -0400<br>&gt; To: pittsburgh-railways@mailman.dementix.org<br>&gt; Subject: Re: [PRCo] Second avenue tracks<br>&gt; <br>&gt; When we are old men and it happened 52-54 years ago, Tom, we do forget the exact details.      <br>&gt; <br>&gt; Now tell me what blocks of 2nd and 5th were done???   Points go for remembering it exactly.   :&lt;)<br>&gt; <br>&gt; Went to lunch today with three former high school classmates (we graduated 56 years ago).   We get together once a month or so to find some unusual food … today was Indian cuisine.   It was a great example of four guys trying to remember the past.   Two of us are having trouble walking … I am one of those … and that is difficult when I remember the days I could start a day on the Norside and walk to Library or Carnegie carrying a ton of camera gear.<br>&gt; <br>&gt; <br>&gt; <br>&gt; <br>&gt; On May 12, 2014, at 8:42 PM, TEP wrote:<br>&gt; <br>&gt; &gt; Whoops my message got snatched--got to remember not to use any HTLM.<br>&gt; &gt; ------------------------------<br>&gt; &gt; <br>&gt; &gt; Thinking back to 1962-63 I remember riding, at speed, on 2nd Ave on what <br>&gt; &gt; was very new, very loud concrete track. Not the last major job, I <br>&gt; &gt; remember (I think) a long stretch on Fifth Avenue being relaid in 63 or 64.<br>&gt; &gt; <br>&gt; &gt; Tom Parkinson P.Eng, Vancouver BC Canada 604-733-5430, cell 604-733-5437<br>&gt; &gt; <br>&gt; &gt; On 12/05/2014 17:21, Fred Schneider wrote:<br>&gt; &gt;&gt; I cannot remember when it was done but my memory was that there was a Second Avenue rail project either near the very tail end of PRC's existence or the very beginning of PAT … probably the last rail job in the city for streetcars.   If the memory isn't flawed, it was t-rail set in concrete.   fws<br>&gt; &gt;&gt; <br>&gt; &gt;&gt; <br>&gt; &gt;&gt; On May 12, 2014, at 7:26 PM, George W. Gula wrote:<br>&gt; &gt;&gt; <br>&gt; &gt;&gt;&gt; When I arrived in Pittsburgh in 1975, Second Avenue had exposed unused<br>&gt; &gt;&gt;&gt; tracks set in concrete from the 10th Street Bridge to the B&amp;O RR overpass<br>&gt; &gt;&gt;&gt; at Irvine Street &amp; Greenfield Avenue. The switches there were also<br>&gt; &gt;&gt;&gt; showing. Browns Hill Road had concrete-set track in it from the top of the<br>&gt; &gt;&gt;&gt; hill at Hazelwood Avenue to the bridge.<br>&gt; &gt;&gt;&gt; <br>&gt; &gt;&gt;&gt; **<br>&gt; &gt; <br>&gt; &gt; <br>&gt; &gt; <br>&gt; &gt; <br>&gt; &gt; <br>&gt; &gt; _______________________________________________<br>&gt; &gt; Pittsburgh-railways mailing list<br>&gt; &gt; Pittsburgh-railways@mailman.dementix.org<br>&gt; &gt; https://mailman.dementix.org/mailman/listinfo/pittsburgh-railways<br>&gt; <br>&gt; <br>&gt; <br>&gt; <br>&gt; <br>&gt; _______________________________________________<br>&gt; Pittsburgh-railways mailing list<br>&gt; Pittsburgh-railways@mailman.dementix.org<br>&gt; https://mailman.dementix.org/mailman/listinfo/pittsburgh-railways<br></div>                                               </div>
</body>
</html>