Old PRCo route numbers-car requirements
Fred Schneider
fschneider at dli.state.pa.us
Tue Nov 23 10:13:59 EST 1999
We should also remember that traffic patterns were a lot different than
we see today ... in most urban areas, streetcar traffic focus on local
factories and downtown shopping areas ... in many cases, imagine a lot
of arrows all aiming at one place. Today, those arrows seem to go
everywhere but downtown.
The street congestion in urban cores in 1915 could be abyssmal beyond
belief. Can you conjure up an image of five streetcars all claiming
street space in one of Pittsburgh's narrow downtown streets? Running
times had to be considerably lengthened in the rush hour. Now throw in
a slew of freight lorrys, buggies, pedestrians. It isn't hard to
imagine 1 car on a shuttle turning into 6 in the rush hour.
-----Original Message-----
From: Vigrass, Bill [mailto:billvigrass at hillintl.com]
Sent: Tuesday, November 23, 1999 9:28 AM
To: pittsburgh-railways at dementia.org; 'John Swindler'
Subject: RE: Old PRCo route numbers-car requirements
I now agree that the best guess is that the "transfer" lines did provide
through service in the peak hours jusst as 81-Atwood did in later years.
Not only did the through cars add capacity on the trunk lines, they did
so
efficiently. If PRCo added a tripper or two on each shuttle line, they
would have gained little productivity and there would probably have been
a
lot of time paid for that was not productively worked. By running them
through, the crews and cars hauled a decent load, often a direct one
seat
(or one standing place) ride. It makes a lot of sense even though
someone
commented that there was other data that seemed to go against that idea.
Anyhow, until someone comes up with a better solution, I'll buy the
through
service. In those days there was LOTS of riding, needing the extra
service.
Bill V.
----------
From: John Swindler [SMTP:j_swindler at hotmail.com]
Sent: Tuesday, November 23, 1999 9:16 AM
To: pittsburgh-railways at dementia.org
Subject: Re: Old PRCo route numbers-car requirements
>Donald Galt replied to Bill Vigrass comment (I can't think of
another
>reason that makes any sense. Maybe it was just an error.)
>
>Don't think so. Six cars are likewise allowed for Library
Street
(10-minute
>peak hour service over a round trip route of 1.4 mi,) and four
for
Corey
>Avenue (quarter-hourly over 1.3 mi.) There's something going on
here that
>we don't understand. Whether peak hour through service or
?????, I
don't
>know.
>
>
>
Considering the accuracy of route vehicle requirement reports
submitted by
current transit operators to PennDOT, errors are a possibility.
But
also,
how were pieces of work put together and where/when were maximum
load
points. In other words, a schedule department problem, and what
you
see in
the Arnold report is their solution.
The answer probably lies in records saved at PTM, and as Ed L.
has
previously commented, anyone really curious is welcome to
research
the
files.
However, it was before my time, but didn't 81-Atwood run through
to
downtown
Pittsburgh during rush hours, but only was a shuttle to Oakland
during the
off-peak? If so, why? Well, probably to provide additional
capacity along
the Forbes/Fifth corridor during peak hours. Off-peaks, Atwood
riders could
transfer to less the full cars operating along Forbes/Fifth.
But
during
rush hours, that extra capacity didn't exist.
Likewise, what was purpose of Corey Ave. and Library St.? Take
mill
employees from their homes to the mills. Single car shuttle
during
most of
the day would suffice. But what happened at shift changes?
Again,
just a
guess, but I suspect the records might show extra trips to the
mills, not
only in Braddock, but what about Homestead and E. Pittsburgh?
You
can still
see that today in Erie where EMTA runs extra buses over their
routes
to GE
plant at shift change, and SEPTA and Altoona put extra buses out
as
school
trippers. When one looks at peak headways, cycle time, and
vehicle
requirements, it doesn't make sense unless one knows the both
the
existence
and purpose of the extra trippers.
Again, this is just a guess. The real answer might lie in the
route
card
files at PTM.
______________________________________________________
Get Your Private, Free Email at http://www.hotmail.com
More information about the Pittsburgh-railways
mailing list