Speed
Jim Holland
pghpcc at pacbell.net
Fri Oct 15 17:38:07 EDT 1999
Greetings!
Kenneth and Tracie Josephson wrote:
> But your rebuttal adds to my contention that the line [Beechview -
> Dormont - Mt. Lebanon LRV}
> is way, way overbuilt. Ken J.
It does seem that way. And after these discussion it would seem
more logical to put the line in a subway all the way - except the prw in
Beechview to SHJ. Or if not in a subway, at least a depressed right of
way that would allow for viaducts over the tracks.
Someone else wrote me privately that this is still really a
streetcar line. When the Overbrook line is rebuilt it will be more an
LRV line. A couple more grade crossings will be eliminated as well.
Don't forget, though, that even when the Overbrook line is
completely double tracked, the curves along the Hillside beside Route 51
will not be 70 mph. It will be faster without all the sidings but still
not break-neck speed operation.
The topography of the line will probably keep speeds to 50 mph
top the whole way!
James B. Holland
------- -- ---------
Pittsburgh Railways Company (PRCo), June of 1949 -- June of 1953
To e-mail *off-list,* please click here: mailto:pghpcc at pacbell.net
N.M.R.A. Life member #2190; http://www.mcs.net:80/~weyand/nmra/
More information about the Pittsburgh-railways
mailing list