[PRCo] Re: Crew Assignments

Jim Holland pghpcc at pacbell.net
Thu Nov 22 03:05:09 EST 2001


Good Morning!!

> John Swindler wrote:

> As for 35 and 36, they were interlined on Sundays only to create a 180 min.
> total cycle time that would only require three cars to maintain a 60 min.
> headway on each 'branch'.  Not needed on Saturday's with a 30 min. headway,
> each branch.

> PRC was into productivity.

	And that is why I am surprized that they did not interline Library and Drake on Saturday
as well.

	Without interlining on Sunday it would have taken 4-cars to keep an hour schedule on each
of the interurbans   ---   interlining cut the overhead 25% from that (or to  *Use* 
figures,  it would take 33% more overhead to run dedicated cars over interlining on
Sundays!!(:->))

	So the percentage of savings on Saturday would not be as great, but the dollar savings
would be the same!!   Don't have to be an accountant to finger that one out!!(:->)

<><><><><><><><><><><><><><><><><><><><><><><><><><><><><><><>

James B. Holland

Holland  Electric  Railway  Operation.......
......"O"--Scale  St.-Petersburg Trams Company Trolleycars  AND......
............"O"--Scale  Parts  mailto:pghpcc at pacbell.net

............Pennsylvania Trolley Museum (PTM) http://www.pa-trolley.org/
......Pittsburgh  Railways  Company  (PRCo),   1930  --  1950
N.M.R.A.  Life member #2190; http://www.nmra.org

<><><><><><><><><><><><><><><><><><><><><><><><><><><><><><><>




More information about the Pittsburgh-railways mailing list