[PRCo] Re: Run numbers
James B. Holland
PRCoPCC at P-R-Co.com
Mon Aug 8 05:37:25 EDT 2005
Paddles -- schedules that coincide with what the bus will do for the
whole day and may include One or More Runs / Drivers to complete --
are printed on::
1.>-- White paper for Weekdays.
2.>-- Yellow paper for Saturdays.
3.>-- Pink paper for Sundays.
At least here in SF!
James B. Holland wrote:
> TRAIN -- identifies Vehicle Schedule and the term Train is even used
> with Trolley- and Motor-Coaches.
>
> RUN -- Schedule worked by Operator / Driver and may be Straight or Split.
>
> What is displayed in the vehicle dash box is Property Choice -- Driver
> Run Number in Shy-Town and Fritsco -- Train Number in other places.
>
> A TRAIN may contain One or More individual RUNs.
>
> I work RUN_157/03-Jackson (until September when I am making a change!)
> which is Part of TRAIN_301 which is the first *-Bus-* out in the
> morning on the 3-Jackson and also happens to be the last one into the
> barn from the 3-Jackson. Please Note that ONLY the last two digits of
> a TRAIN Number indicates sequencing from the barn - any numbers before
> these two indicate the line. RUN_49 is the first to drive TRAIN_301
> who is relieved by RUN_30 and I in turn relieve RUN_30 -- so three
> RUNs are included in TRAIN_301.
>
> The 30-Stockton also works from my barn and the first train out on the
> 30-line is TRAIN_3001!
>
>
>
> BLOCK -- Group of Runs chosen by an Operator / Driver, usually those
> with the lowest seniority.
>
> ((Seems possible that Block and Train may be used interchangeably on
> various properties.))
>
>
> Some Runs work only 5-days, some 6-days, some all seven days but
> individual schedules vary according to the day -- a Monday-Fri
> schedule will be the same but different from Sat and even Sun because
> of running times needed to complete a trip. Operators / Drivers work
> 5-days consecutively (usually) so the extra day(s) not worked by the
> Operator / Driver on the Run Pick are then assembled into BLOCKs of
> Runs to be picked. These BLOCKs may have runs all on one line or all
> on different lines or any combination thereof. And while the blocks
> try to keep working times similar on all working days, this is not
> always possible and it is possible to have some days and evenings
> mixed or evenings and Owls. Extra runs available not assigned to
> Blocks are then Detailed by the Dispatcher on that day.
>
>
>
> Examples:
>
> Run_001 Works Monday Through Friday Only - Operator / Driver Run cut
> for this does same, no extra days.
>
> Run_002 Works Monday Through Saturday, Driver works Monday Through
> Friday, Saturday is available for assembly into block.
>
> Run_003 Works 7-Days, Driver works 5-days and has Sun-Mon off so Sun
> and Mon available for assembly into block.
>
> Run_004 Works 7-Days, Driver works 5-days and has Tuesday-Wed off so
> these days available for assembly into block.
>
>
> Block_001 consists of: Run_002 on Sat, Run_003 on Sun-Mon, Run_004 on
> Tues-Wed and has Fri-Sat as Regular Day Off (RDO.)
Jim__Holland
I__Like__Ike.......And__PCCs!!
down with pantographs ---- UP___WITH___TROLLEYPOLES!!!!!!!
More information about the Pittsburgh-railways
mailing list