[PRCo] Re: Double--Point__RR__Turnouts-__-1940--1950

hrbran99 at adelphia.net hrbran99 at adelphia.net
Mon Dec 11 09:27:33 EST 2006


I can remember one on the Overbrook single track at one of the sidings. The siding was between two high bridges and had a slight curve in the double track portion of the siding. I remember this because I would always ask older operators if they knew when and why this type of switch was installed. None of them could ever give a reason for the railroad type switch and none of them could recall when it was installed.
--
HrB

---- Jim Holland <prcopcc at p-r-co.com> wrote: 
> This is a Trivia Question Only for those who Are Interested:
> .
> Where did PRCo use::
> .
> ..........Double--Point__RR__Turnouts-__-1940--1950??
> .
> A photo of one is enclosed.
> .
> .
> .
> JJ
> 
> -- Attached file removed by Ecartis and put at URL below --
> -- Type: image/jpeg
> -- Size: 145k (148870 bytes)
> -- URL : http://lists.dementia.org/files/pittsburgh-railways/RR%20Double%20Point%20Turnout%20096.jpg
> 
> 
> 




More information about the Pittsburgh-railways mailing list