Another Myth Bashed
Edward H. Lybarger
twg at pulsenet.com
Tue Feb 1 10:24:39 EST 2000
For quite a number of years, I had believed that the bridge carrying the
interurban lines over Warrington Avenue had been replaced by a double-track
facility in the late 1920s because of a trolley collision at that point a
short time earlier. While I don't recall the exact source of that rumor
(and there was such a collision), it was interesting to last evening read
the PRCo file on the subject and learn that the City had been pressuring the
company for some time to get rid of the earlier structure with a column in
the middle of the roadway. The strongly worded letter from the City exists
in the file, and the operative word in it is "menace." Construction began
in 1928 and took until 1930 to complete (by the low bidder, of course).
Other interesting trivia: There was a design to put the operators' practice
track on the hill above South Hills Jct. It would have looped in the
substations area and utilized the original P&CS horseshoe curve leading
toward the old tunnel, and there would have been a second loop up on the
hillside near the steps leading up from the station. Another proposal would
have used the "lightly patronized" Beechview route during the day as far out
as the soon-to-be-abandoned Neeld Avenue loop for operator instruction.
PRCo was hated by its suppliers, as well as the politicians. Correspondence
regarding the inspection of ties used to build the Pittsburgh, Canonsburg &
Washington in 1908 reveals that the area's lumber vendors were all unhappy
at PRCo's inspection standards. Judging from some of the reports, they must
have wanted some pretty demanding conditions, such as accurate counts and
quality lumber!
Ed