[PRCo] Re: Northside rail

Harold Geissenheimer transitmgr2 at earthlink.net
Thu Jul 24 23:06:16 EDT 2003


Greetings

The Chesnut street rail is set in concrete I think.

Rail on Second ave along the river was also inconcrete.

The City had an engineer who liked concrete paving.  A lot
downtown.

Rail under asphalt was common as an alternative to
expensive removal.

Harold Geissenheimer


Bob Rathke wrote:



More information about the Pittsburgh-railways mailing list