[PRCo] Re: Derail
Herb Brannon
hrbran at sbcglobal.net
Mon Oct 1 09:25:35 EDT 2007
There was no mention of the "derail" in the 1973 PATransit Trolley Operators Manual. In an informational memo put out for operators in 1978 it is stated that only a "Safety Stop" must be made prior to proceeding into the tunnel. This memo is quite interesting inasmuch as it contains track maps of SHJct after the rebuilding and signal locations, safety requirements, etc.
John Swindler <j_swindler at hotmail.com> wrote:
I once heard it referred to as a 'necessary action, delayed action' switch, or something like that.
Was something like that an official PRC designation, or an explanation by on OT railfan to this (at the time) young kid railfan???
It was a long time ago.
John
Herb Brannon
More information about the Pittsburgh-railways
mailing list