[PRCo] Re: Making sense of the PRC assignments....
Dwight Long
dwightlong at verizon.net
Mon Feb 20 15:21:08 EST 2012
Phil
Two things I neglected to mention in my earlier response to your email.
1) 3750s were used on Sewickley long before 1948. I have forwarded a
picture of one on that route in 1941. I do not know what date this
operation started, or when the 3750s (part of the fleet) were modified with
the left door, but it was before WW II.
2) The tracks on West Carson most assuredly did NOT last until the end of
the West End lines. West Carson was repaved without tracks well before that
date--1959. As a result, the Railways had to install what may have been the
last brand new trackage they built, connecting links between the West End
and North Side lines across Stanwix Street in the Triangle. This was the
only connection between the West End and the rest of the system after the
demise of the West Carson trackage.
Dwight
----- Original Message -----
From: "Phillip Clark Campbell" <pcc_sr at yahoo.com>
To: <pittsburgh-railways at dementix.org>
Sent: Monday, February 20, 2012 8:17 AM
Subject: [PRCo] Re: Making sense of the PRC assignments....
> Mr.Long,
>
>
> I beg to differ. The 2-turns from Tunnel to and from W.Carson were
> not added until some time after WW2 so the cars had to go into
> downtown first didn't they. These tracks came very late in the game;
> not long after they were added the need for the 3750s diminished
> significantly because all PCCs were delivered. PCCs did not have
> the left door obviously; what Prc thought about the need for this is
> not known is it. Here is a photo:
> http://www.davesrailpix.com/pitts/htm/bvp013.htm
>
>
> I thought the turns were added by 1947 but I have some photos in
> June-1947 revealing this is not the case. The 2-turns may have been
> installed as late as 1948. I have seen ridership statistics which
> reveal a peak in 1947; it seems foresight of the day thought these
> 2-turns would be valuable. Almost as soon as they were installed
> they became obsolete didn't they. Here is the crossover where the
> 32-line changed ends to and from route; this is not possible with the
> 3750s is it:
> http://www.davesrailpix.com/pitts/htm/bvp003.htm
>
>
>
> Mr.Swindler has already mentioned this aspect we have overlooked.
> Ingram was not a large facility; in these days many of the cars were
> scrapped by burning at Ingram weren't they. Pictures are available
> of many low-floor
> cars, Interurbans, even 3556 at Ingram under
> the torch.
> Storage space for equipment might not be sufficient for
> all needs until after scrapping ceased here. By that time, even PCCs
> were excess to needs. I have seen some photos showing the cars
> burning; these do not:
> http://www.davesrailpix.com/pitts/htm/bvp126.htm
>
> http://www.davesrailpix.com/pitts/htm/bvp127.htm
>
>
>
>
> W.Carson tracks remained until closure of West End didn't they.
>
>
>
> Phil
>
>
>
> ________________________________
> From: Dwight Long <dwightlong at verizon.net>
> To: pittsburgh-railways at dementix.org
> Sent: Saturday, February 18, 2012 4:46 PM
> Subject: [PRCo] Re: Making sense of the PRC assignments....
>
> Phil
>
> See my earlier response on this issue.
> Stem times from Tunnel to Rt. 23 were either favorable as opposed to
> Ingram or about the same with better operating characteristics.
> Until the tracks on Rt. 32 were torn up, it was NOT circuitous to
> feed cars on and off Rt. 23 from Tunnel. By the time the
> West Carson Street tracks were removed (after Rt. 32 ended),
> Rt. 23 was already gone.
>
> At any rate, 3750s were not needed on Rt. 23
> by the time frame under consideration.
>
> Dwight
>
> From: Phillip Clark Campbell
> Sent: Saturday, 18 February, 2012 11:29
> To: pittsburgh-railways at dementix.org
> Subject: [PRCo] Re: Making sense of the PRC assignments....
> My apologies, Mr.Swindler, I hit the reply too
> soon.
> Yes! Low-
> 3750s had the door; this is already identified.
> The 3750s could be used as
> trippers to the Neville Island Loop
> couldn't they; many other lines had short turn trippers for rush
> hour service. The 13 had the 14, 42 had 43, 56 had the 56A,
> 88 had the 'short.' Apparently some cars "turned" using the
> cross-over where the loop was constructed for the 25-line.
>
> I too have often wondered about the 3750s being based at SHJ.
> How did the cars get to and from route? That would be circuitous
> and add much off-route trackage and even more time as it all
> occurs in downtown.
>
> It is also interesting to note that the 2-turns from the tunnel to
> W.Carson Street were added after the war, presumably for the
> Neville Island route which also helped the 32-line. Ridership
> reached its peak in 1947, well after the war, and a down trend
> could not be identified until consecutive years show less
> patronage. We have the "advantage" of hind sight don't we;
> Prc did
> not.
>
>
>
> Phil
>
>
More information about the Pittsburgh-railways
mailing list