[PRCo] Re: Making sense of the PRC assignments....
Derrick Brashear
shadow at gmail.com
Mon Feb 20 15:23:50 EST 2012
> 2) The tracks on West Carson most assuredly did NOT last until the end of
> the West End lines. West Carson was repaved without tracks well before that
> date--1959. As a result, the Railways had to install what may have been the
> last brand new trackage they built, connecting links between the West End
> and North Side lines across Stanwix Street in the Triangle. This was the
> only connection between the West End and the rest of the system after the
> demise of the West Carson trackage.
>
I seem to recall having that discussion, in the "what if" west end
ended up being served via the Smithfield
St Bridge, West Carson and so on discussion.
--
Derrick
More information about the Pittsburgh-railways
mailing list