[milwaukee-electric] Theory on the Fond du Lac Training Loop
Ken and Tracie
ktjosephson at embarqmail.com
Thu Nov 19 07:54:40 EST 2009
Okay, we all know the cars on the training loop used a negative return =
wire like trackless trolleys and Cincinnati/Havana/Merrill streetcars =
after the loop was isolated from the remainder of the rail system.
I still do not understand why a jumper cable could not have been run =
from the rails of the loop to the trackless trolleys' negative return =
feeders.
Does anybody know the reason the loop was converted to twin wires? =
Safety concerns? Bad rail bonds on the loop?=20
I remember visiting Orange Empire during the 1990s. There was a bad rail =
bond by the depot which would shoot sparks if a nearby car was drawing =
power.=20
I am wondering if the rail bonds were bad and M&ST decided twin wires =
was a more economical solution than restoring bonds on training trackage =
which was going to be redundant within a decade?=20
Any thoughts on this?
K.
-- Attached file removed by Ecartis and put at URL below --
-- Type: image/jpeg
-- Size: 160k (163993 bytes)
-- URL : http://lists.dementia.org/files/milwaukee-electric/tmcity060.jpg
More information about the Milwaukee-electric
mailing list